Salario promedio: $50.000 /por mes
Más estadísticasResultados de la búsqueda: 16 vacantes
...on-demand, zero defects, and standardized work. Deploy tools including kanban, value stream mapping, visual management, pull systems, TPM, SMED, and 5S as applicable
Coach and lead the full-time leaders of the site/business and continuous improvement professionals...
...de realizar el mantenimiento (preventivo, correctivo, predictivo), implementacion de mejoras (Poka yokes,optimizaciones al proceso, TPM) a maquinaria y equipo con los estandares de calidad para dar cumplimiento a los requerimientos de producción.
Conocimientos:
-...
...asegurando un ambiente laboral positivo y motivador. (supervisores de almacén y personal sindicalizado)
- Conocimiento de Procesos TPM y mejora continua.
- Identificar áreas de mejora en los procesos y proponer soluciones eficientes.
Requisitos:
- Licenciatura/...
...deseables
~ Carrera de Ingeniería Terminada
~ Inglés Avanzado
~ Cursos de Manufactura de Clase Mundial enfocados en Mantenimiento como TPM, Project Management, DMAIC, Lean Manufacturing, entre otros.
~ Experiencia mayor de 5 años como Gerente de mantenimiento de equipo...
...Industrial, Manufacturing, Processes, Mechatronics
Knowledge on Lean Manufacturing System.
Knowledge on 5’s, Andon, Std work, Kanban, TPM, SMED, 7 + 1 wastes, GENBA, VSM
Knowledge on Office, AutoCad, Solidworks.
Hands-on, willing to spend most of his time on the...
...responsabilidades :
Ingeniería o Licenciatura terminada.
Idioma: Inglés (Preferente).
Conocimiento en lean manufacturing, 5’s, SMED, TPM.
Manejo Paqueteria de office.
Manejo del trabajo estandarizado.
Disponibilidad de Horario.
Conocimiento de Costo, Scrap...
...Solicitudes de cotización
DEBES TENER
Carrera Tecnica o Bachillerato concluido, en adelante.
Más de 2 años de experiencia en TPM (Mantenimiento de equipos de producción)
Experiencia en SMED (Cambios rápidos de herramientas)
Más de 2 años de experiencia...
...de mantenimiento preventivo que le corresponden.
• Revisa y atiende las ordenes de trabajo (correctivo, mejora, trabajo especial, TPM) que se le asignen.
• Realiza la solicitud de material y refacciones.
• Realiza el llenado de los reportes del área.
• Mantiene...
...Utilize quality tools QC7 for improvement FEA, DOE, FMEA, SPC, VAVE activities.
Drive productivity improvements through SMED and TPM activities
Other projects and assignments as requested by the management team.
Qualifications
A minimum of a BS degree, preferably...
...Lean principles, tools, and systems such as Value Stream Mapping, Cell Design, Material Flow, Visual Management, Standard Work, 5S, TPM, Change Over, Mistake Proofing, Root Cause Analysis, Kaizen.
Demonstrated experiences with transforming business processes, with the...
...warehouse space and equipment flow optimization projects.
Responsible for the inventory control of mobile equipment, follows up the TPM of the equipment to ensure its availability and optimal conditions, knows the technical specifications of the mobile equipment for...
...Preventive Maintenance and Auto maintenance Plans
2.1. Accomplish 100% the preventive maintenance y corrective plans
2.2. Leads TPM Workshops, participate in SMED workshops.
2.3. Identify and implement continuous improvement activities in order to meet MTBR, MTBF...
...para trabajar bajo presión
Responsabilidades:
• Realizar programa de mantenimiento preventivo anual.
• Establecer programa de TPM y SEC
• Supervisa a los técnicos de mantenimiento.
• Entrenar personal de nuevo ingreso
• Desarrolla y mantiene actualizado el...
...communication at all levels.
~ Strong Core Tools Knowledge
~ Strong VSM and Lean Manufacturing Knowledge
~ Six Sigma and TPM tools knowledge
~ Ability to multi-task and work in a challenging environment
~ Sense of urgency
~ Schedule availability...
...problemas y conocimientos de herramientas básicas como Fishbone, 5 why's, etc.
· Conocimientos en sistemas de producción: 5S, SMED, TPM, etc.
Requisitos:
· Ingeniería- Titulo es indispensable; área o especialidad: Mecánica, Eléctrica, Industrial, Electrónica,...
...Seguimiento de proyecto de nstroduccion de nuevos equipos
~-Alta masiva de refacciones
~-Seguimiento a proyecto LOTO
~-Implementacion TPM.
IMPULSANDO LA FUERZA DE LA DIVERSIDAD.
BRP fomenta una cultura que invita, conecta e impulsa las ambiciones de las personas de...